The Sewage Pumping Station Estimating Calculator calculates the Plant, Materials and Labour associated with the excavation and installation of a sewage pumping station.
The Sewage Pumping Station Estimating Calculator calculates the following items:
- Removal of spoil
- Backfill materials
- Concrete base & side
- Sewage pump
- Discharge pipe
- Mains connection costs
- Plus all labour associated with the above
NOTE:
- Use the Drainage Plant Estimating Calculator to add in plant for the excavation.
- This Estimating Calculator is NOT linked to the Specifications.