The Site Mix Concrete Estimating Calculator is used to calculate the Labour and Materials required to mix concrete for foundations on-site
The Site Mix Concrete Estimating Calculator calculates the following items:
- Ballast
- Sand
- Cement
- Plus all labour and plant associated with the above
To estimate for site mix concrete you must set the concrete product used in other Estimating Calculators to 'Not Required' and then enter the volume of concrete calculated into the 'M3 of Concrete' box on the Summary page of the Site Mix Concrete Estimating Calculator.
This will ensure that the other Estimating Calculators are still calculating for excavation of the trench, but you are not estimating for the concrete twice.